104 national highway project
-
Bridge
project
-
天
Construction period
-
9.91km²km²
Construction area
Project details
The reconstruction project of Pingyang Guo Zhuang to Chenxia à section of National Highway 104 is 9.91 kilometers long. It is of Class I highway standard and asphalt concrete pavement, with a design speed of 80 kilometers per hour, two-way four lanes, and a roadbed width of 24.5 meters, of which 4.5 meters of auxiliary lanes are added on both sides of the crossing section of Kunyang Town, and the roadbed width is 33.5 meters. The total project investment is 602 million.
Case
Best products
Excellent quality
Professional customization
direct deal
Contact number:0571-28197870