欢迎光临浙江泰正建材有限公司

400-6817179
收藏泰正  |    /  EN
您的位置:首页> 工程案例 > 桥梁 > 104国道工程

104国道工程

  • Bridge

    项目

  • 工期

  • 9.91km²km²

    施工面积

项目详情

    The reconstruction project of Pingyang Guo Zhuang to Chenxia à section of National Highway 104 is 9.91 kilometers long. It is of Class I highway standard and asphalt concrete pavement, with a design speed of 80 kilometers per hour, two-way four lanes, and a roadbed width of 24.5 meters, of which 4.5 meters of auxiliary lanes are added on both sides of the crossing section of Kunyang Town, and the roadbed width is 33.5 meters. The total project investment is 602 million.

工程案例

至臻精品

卓越品质

专业定制

厂家直销

联系电话:0571-28197870